SOIL TEST & GEOTECHNICAL SURVEY
Particulars Sample size
required
Reference IS Code Time Frame
Geotechnical investigation of the site using verious soil exploration technics
At actual requirement
IS 1498 , IS 2720 , IS 2131 , IS 9143 , IS 8764 , IS 1124
As per work volume
FDT per location
a) By Sand Replacement Method
b) By Core Cutter Method.
In situ Test
In situ Test
IS 2720 : Part 28 1974
IS 2720 : Part 29 : 1975
2 days
2 days
Moisture Content
50kg
IS 2720 : Part 2 1973
2 days
Specific Gravity
50kg
IS 2720 : Part 3 1980
2 days
Grain Size Analysis by Sieving
50kg
IS 2720 : Part 4 1985
2 days
Free Swell Index
50kg
IS 2720 : Part 40 1977
3 days
Atterberg's Limit's (LL & PL) & Plasticity Index
10kg
IS 2720 : Part 5 1985
2 days
Shrinkage limit
10kg
IS 2720 Part 5
4 days
Grain Size Analysis by Hydrometer Analysis
10kg
IS 2720 : Part 4
2 days
Swelling pressure
10kg
IS 2720 : Part 31
7 days
Classification of Soil as per
a) If Grain size & Atterberg's limit requested.
b)Grain size & Atterberg's limit's mandatory
50kg

50kg
IS 2720 : Part 4 , IS 2720 : Part 5 IS 1498
IS 2720 : Part 4 , IS 2720 : Part 5 IS 1498
4 days

4 days
Proctor Compaction Test / MDD & OMC (Standard)
35kg
IS 2720 : Part 7
3 days
Proctor Compaction Test / MDD & OMC(Modified)
35kg
IS 2720 : Part 8
3 days
Direct shear test (6X6X2.5cm)
a) Unconsolidated undrained
b) Consolidated undrained
c) Consolidated drained
d) Additional each cycle
100kg
100kg
-
-
IS 2720:Part 13
IS 2720:Part 13
-
-
4 days
4 days
4 days
4 days
Laboratory CBR
a) Soaked
b) Unsoaked
150kg
150kg
S 2720 : Part 16
S 2720 : Part 16
6 days
4 days
Field CBR
In situ Test
IS 2720 : Part 31
1 days