| Particulars |  Sample size  required  | 
                                Reference IS Code | Time Frame | 
|---|---|---|---|
Geotechnical investigation of the site using verious soil exploration technics | 
                                    At actual requirement | 
                                    IS 1498 , IS 2720 , IS 2131 , IS 9143 , IS 8764 , IS 1124 | 
                                    As per work volume | 
                                
 FDT per location |  
                                |||
a) By Sand Replacement Methodb) By Core Cutter Method. | 
                                      In situ TestIn situ Test | 
                                    IS 2720 : Part 28 1974IS 2720 : Part 29 : 1975 | 
                                    2 days2 days | 
                                
Moisture Content | 
                                    50kg | 
                                    IS 2720 : Part 2 1973 | 
                                    2 days | 
                                
Specific Gravity | 
                                    50kg | 
                                    IS 2720 : Part 3 1980 | 
                                    2 days | 
                                
Grain Size Analysis by Sieving | 
                                    50kg | 
                                    IS 2720 : Part 4 1985 | 
                                    2 days | 
                                
Free Swell Index | 
                                    50kg | 
                                    IS 2720 : Part 40 1977 | 
                                    3 days | 
                                
Atterberg's Limit's (LL & PL) & Plasticity Index | 
                                    10kg | 
                                    IS 2720 : Part 5 1985 | 
                                    2 days | 
                                
Shrinkage limit | 
                                    10kg | 
                                    IS 2720 Part 5 | 
                                    4 days | 
                                
Grain Size Analysis by Hydrometer Analysis | 
                                    10kg | 
                                    IS 2720 : Part 4 | 
                                    2 days | 
                                
Swelling pressure | 
                                    10kg | 
                                    IS 2720 : Part 31 | 
                                    7 days | 
                                
 Classification of Soil as per |  
                               |||
a) If Grain size & Atterberg's limit requested.b)Grain size & Atterberg's limit's mandatory | 
                                50kg50kg | 
                                IS 2720 : Part 4 , IS 2720 : Part 5 IS 1498IS 2720 : Part 4 , IS 2720 : Part 5 IS 1498 | 
                                4 days4 days | 
                            
Proctor Compaction Test / MDD & OMC (Standard) | 
                                35kg | 
                                IS 2720 : Part 7 | 
                                3 days | 
                            
Proctor Compaction Test / MDD & OMC(Modified) | 
                                35kg | 
                                IS 2720 : Part 8 | 
                                3 days | 
                            
 Direct shear test (6X6X2.5cm) |  
                                 |||
a) Unconsolidated undrainedb) Consolidated undrainedc) Consolidated drainedd) Additional each cycle | 
                                100kg100kg-- | 
                                
                                IS 2720:Part 13IS 2720:Part 13-- | 
                                4 days4 days4 days4 days | 
                            
 Laboratory CBR |  
                                 |||
a) Soakedb) Unsoaked | 
                                150kg150kg | 
                                S 2720 : Part 16S 2720 : Part 16 | 
                                6 days4 days | 
                            
Field CBR | 
                                In situ Test | 
                                IS 2720 : Part 31 | 
                                1 days | 
                            
All Rights Reserved © 2020 CONSTROLOGIX