Particulars | Sample size required |
Reference IS Code | Time Frame |
---|---|---|---|
Geotechnical investigation of the site using verious soil exploration technics |
At actual requirement |
IS 1498 , IS 2720 , IS 2131 , IS 9143 , IS 8764 , IS 1124 |
As per work volume |
FDT per location |
|||
a) By Sand Replacement Methodb) By Core Cutter Method. |
In situ TestIn situ Test |
IS 2720 : Part 28 1974IS 2720 : Part 29 : 1975 |
2 days2 days |
Moisture Content |
50kg |
IS 2720 : Part 2 1973 |
2 days |
Specific Gravity |
50kg |
IS 2720 : Part 3 1980 |
2 days |
Grain Size Analysis by Sieving |
50kg |
IS 2720 : Part 4 1985 |
2 days |
Free Swell Index |
50kg |
IS 2720 : Part 40 1977 |
3 days |
Atterberg's Limit's (LL & PL) & Plasticity Index |
10kg |
IS 2720 : Part 5 1985 |
2 days |
Shrinkage limit |
10kg |
IS 2720 Part 5 |
4 days |
Grain Size Analysis by Hydrometer Analysis |
10kg |
IS 2720 : Part 4 |
2 days |
Swelling pressure |
10kg |
IS 2720 : Part 31 |
7 days |
Classification of Soil as per |
|||
a) If Grain size & Atterberg's limit requested.b)Grain size & Atterberg's limit's mandatory |
50kg50kg |
IS 2720 : Part 4 , IS 2720 : Part 5 IS 1498IS 2720 : Part 4 , IS 2720 : Part 5 IS 1498 |
4 days4 days |
Proctor Compaction Test / MDD & OMC (Standard) |
35kg |
IS 2720 : Part 7 |
3 days |
Proctor Compaction Test / MDD & OMC(Modified) |
35kg |
IS 2720 : Part 8 |
3 days |
Direct shear test (6X6X2.5cm) |
|||
a) Unconsolidated undrainedb) Consolidated undrainedc) Consolidated drainedd) Additional each cycle |
100kg100kg-- |
IS 2720:Part 13IS 2720:Part 13-- |
4 days4 days4 days4 days |
Laboratory CBR |
|||
a) Soakedb) Unsoaked |
150kg150kg |
S 2720 : Part 16S 2720 : Part 16 |
6 days4 days |
Field CBR |
In situ Test |
IS 2720 : Part 31 |
1 days |